Installation instructions for the X10 PRO 120/208V Smart Coupler/Repeater (XPCR).
Installation instructions for the X10 PRO 120/208V Smart Coupler/Repeater (XPCR) — couples X-10 power line carrier signals between phases in split-phase or three-phase installations while boosting and repeating the signal onto all phases.
The XPCR is designed to couple X-10 power line carrier signals between phases in single (split-phase) or three-phase installations, while at the same time boosting the original signal and "repeating" it onto all phases.
Warning: Installation must be carried out by qualified installers only. The main breaker must be turned off during installation, and the coupler must be installed in a suitable workbox or equivalent enclosure. Installation must comply with all applicable codes and requirements, including the National Electrical Code (NEC).
When a valid X-10 command is received on either phase of the electrical system, the LED on the Coupler/Repeater flashes rapidly three times, verifying correct operation.